It's been hard work laying bricks day after day, but very satisfying and a great work out!!
|
I used guide lines for each row of bricks, checking with the level as I went along |
|
Here I put in structure to for a kitchen counter on the verandah coming out of the wall |
|
The planks for the counter are an old railway sleeper cut into two planks above is a framework to make a clay shelf |
|
working up to making the arches over the windows |
|
Misheck came to help me make the form work to support the arches as I laid them, we used materials from the bush around us. |
|
First arch up |
|
It's amazing to see how strong the arches are, as soon as the bricks were in place I removed the form work so the bricks settled properly. |
|
Making the arch for the door |
|
I laid bottles around the arched windows facing in, and these bottles above the kitchen counter and shelves, I plan but some fairy lights inside the bottles. |
|
Oly has been great, coming back from the school in the village at lunch time and playing whilst I build everyday until late afternoon. |
|
As the walls got higher the work was harder, a very make shift scaffold that has to be moved around the house |
|
The lintel above Oly's room is a railway sleeper |
|
So the brick work is complete, I need the walls to dry throughly before plastering with clay and lime. So the next step are making the floors, building a store room and a whole list of other things!!! |